Mon, November 3, 2025
Daily Schedule of Managing Director

03
November 2025
Sun Mon Tue Wed Thu Fri Sat
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30            
9:00am  
10:00am [10:00am-12:00pm] Japan-Korea Joint Mission to Bangladesh Inspection of Dhaka Metro Line 6 Depot
Description:
Japan-Korea Joint Mission to Bangladesh Inspection of Dhaka Metro Line 6 Depot

[10:00am-11:00am] MRT Line-2 প্রকল্পের পিডিপিপি’র পর্যালোচনা সভা
Description:

সভাপতি: জনাব কবির আহামদ (অতিরিক্ত সচিব), বিভাগীয় প্রধান, ভৌত অবকাঠামো বিভাগ


[10:00am-11:00am] Press Berafing
Description:
Press Berafing

11:00am
12:00pm  
1:00pm  
2:00pm [2:00pm-3:00pm] Meeting with MRT Line 4 Feasibility Study Team
Description:

Meeting with MRT Line 4 Feasibility Study Team


3:00pm  
4:00pm [4:00pm-5:00pm] Meeting with IICT, BUET
Description:
Meeting with IICT, BUET

5:00pm  
Logo
Powered by DMTCL ICT